| Weight & dimensions | |
| Weight | 34 g |
| Packaging content | |
| Cleaning cloth | ![]() |
| Quantity per pack | 2 pc(s) |
| Design | |
| Product colour | Gray |
| Dust container type | Dust bag |
| Performance | |
| Wet mopping | ![]() |
| Features | |
| Brand compatibility | Roborock |
| EAN | 6970995788792 |
This package contains two genuine Roborock Double VibraRise 2.0 Mop Cloths, model 8.02.0317. They are engineered specifically for the VibraRise mopping system to ensure correct fit and function. Compatibility is limited to the Roborock S8 MaxV Ultra and S8 Max Ultra series robotic vacuum cleaners. Using a manufacturer-approved accessory helps maintain the cleaning integrity and performance of the device's integrated mopping hardware.
The cloths are designed for effective wet mopping on hard floors, working with the vacuum's sonic vibration technology to scrub surfaces. Their material and construction are optimized for water absorption and dirt removal. To maintain cleaning performance, it is recommended to replace the mop cloth every three to six months, depending on frequency of use and floor conditions. For proper care, wash the cloths as directed without using fabric softeners.
Key Features:- Product type: Mop cloth accessory pack
- Quantity: Two cloths per pack
- Brand compatibility: Designed for Roborock
- Model compatibility: Fits S8 MaxV Ultra and S8 Max Ultra series
- Intended function: Wet mopping
- Suitable surfaces: Hard floors
- Product color: Gray
- Recommended replacement cycle: 3 to 6 months
Estimated delivery: 12.02 - 16.02
Today: 11:00 - 15:00
Estimated delivery: 12.02 - 16.02
Today: Closed
Estimated delivery: 12.02 - 16.02
Today: Closed
Estimated delivery: 12.02 - 16.02
Today: Closed
Estimated delivery: 12.02 - 16.02
Today: 10:00 - 14:00
Estimated delivery time: 12.02 - 16.02
Estimated delivery time: 12.02 - 15.02
Estimated delivery time: 13.02 - 16.02
Estimated delivery time: 13.02 - 16.02
Estimated delivery time: 13.02 - 15.02
Estimated delivery time: 12.02 - 16.02
Estimated delivery time: 12.02 - 16.02
Estimated delivery time: 13.02 - 15.02

