Eaton 9PX Lisäakusto 3U 240V. Käytetään 9PX 8 kVA ja 9PX 11 kVA mallien yhteydessä jatkamaan varakäyntiaikaa. Max 11 lisäakustoa / UPS-laite. Yli 5:n lisäakust
Weight & dimensions | |
Weight | 65 kg |
Height | 130 mm |
Width | 440 mm |
Depth | 680 mm |
Operational conditions | |
Operating temperature (T-T) | 0 - 40 °C |
Features | |
Battery technology | Sealed Lead Acid (VRLA) |
Compatibility | 9PX 6 kVA (3:1) / 9PX 8kVA / 9PX 11kVA |
Number of battery cells | 20 |
Product colour | Black |
Hot-swap battery | |
Battery voltage | 240 V |
Battery capacity | 9 Ah |
EAN | 0743172039422 |
Warranty | 2 years |
Source: Icecat.biz |
The Eaton 9PX UPS provides energy-efficient power protection for small & medium Datacentres, IT rooms and Infrastructure. Delivering double conversion protection with 40% less energy usage and 28% more power 9PX is the perfect UPS for IT and Facility managers that are concerned by energy cost and are looking for next generation power protection solutions.
- Online double conversion topology
- Energy efficient (up to 95% in Online mode, 98% in high-efficiency mode, ENERGY STAR® qualified UPS)
- Next-generation graphical LCD display (7 languages)
- Provides more real power (watts) to protect more equipment with a 0.9 power factor
- Parallel operation using HotSync technology (available in Q2 2013)
- Maintenance ByPass available as standard (on HotSwap/BP version)
- Energy metering - kWh values can be monitored using the LCD or Eaton’s Intelligent Power Software Suite
- Compatible with Virtual environments (VMware, Hyper-V, Citrix Xen, Redhat)
Estimated delivery: 27.11 - 29.11
Today: 10:00 - 18:00
Estimated delivery: 27.11 - 29.11
Today: 09:00 - 17:00
Estimated delivery: 27.11 - 29.11
Today: 10:00 - 18:00
Estimated delivery: 27.11 - 29.11
Today: 10:00 - 17:00
Estimated delivery: 27.11 - 29.11
Today: 10:00 - 18:00
Estimated delivery: 27.11 - 29.11
Today: 10:00 - 17:00
Estimated delivery: 27.11 - 29.11
Today: 10:00 - 18:00
Estimated delivery time: 27.11 - 29.11
Estimated delivery time: 27.11 - 28.11
Estimated delivery time: 28.11 - 29.11
Estimated delivery time: 28.11 - 29.11
Estimated delivery time: 28.11
Estimated delivery time: 28.11