109290€
Show VAT 0%
Show VAT 25,5%
Multitronic Vaasa
Multitronic Pietarsaari
Multitronic Jyväskylä
Multitronic Lappeenranta
Multitronic Mariehamn
Specifications
Description
Store availability
Delivery
Price development
Ports & interfaces | |
Output connections | 36x IEC 320 C13 6x IEC 320 C19 |
Input connection type | IEC 309 32A 2P+E |
AC outlets quantity | 42 AC outlet(s) |
Power plug | IEC309 |
AC outlet types | C13 coupler, C19 coupler |
Weight & dimensions | |
Weight | 6.93 kg |
Height | 1791 mm |
Width | 56 mm |
Depth | 44 mm |
Energy management | |
Nominal output voltage | 230 V |
Maximum total current draw per phase | 32 A |
Maximum input current per phase | 32 A |
Load capacity | 7680 VA |
Maximum power | 7680 W |
AC input frequency | 50 - 60 Hz |
Operational conditions | |
Operating relative humidity (H-H) | 5 - 95% |
Storage temperature (T-T) | -25 - 65 °C |
Operating temperature (T-T) | 5 - 45 °C |
Storage relative humidity (H-H) | 5 - 95% |
Certificates | |
Certification | RoHS, REACH IEC 60950,VDE |
Management features | |
Monitoring | Current, Power, Voltage |
Design | |
Type | Single-phase |
Product colour | Black |
Mounting | Vertical |
Rack capacity | 0U |
PDU types | Metered |
Features | |
Cable length | 3 m |
Logistics data | |
Total carbon footprint (kg of CO2e) | 28921.23 |
EAN | 0731304277019 |
Warranty | 1 year |
Source: Icecat.biz |
APC Metered Rack Power Distribution Units (PDUs) provide active metering to enable energy optimization and circuit protection. The output and input connections are (36) C13 & (6) C19, and the cable length is 3m. User-defined alarm thresholds mitigate risk with real-time local and remote alerts to warn of potential circuit overloads. Metered Rack PDUs provide power utilization data to allow Data Center Managers to make informed decisions on load balancing and right sizing IT environments to lower total cost of ownership. Metered Rack PDUs include real power monitoring, a temperature/humidity sensor port, locking IEC receptacles, and ultra low profile circuit breakers. Users can access and configure Metered Rack PDUs through secure Web, SNMP, or Telnet Interfaces which are complimented by APC Centralized Management platforms using InfraStruxure Central, Operations, Capacity, and Energy Efficiency.
Multitronic Vaasa: 0 pcs
Estimated delivery: 30.09 - 02.10
Estimated delivery: 30.09 - 02.10
Today: 10:00 - 18:00
Multitronic Pietarsaari: 0 pcs
Estimated delivery: 30.09 - 02.10
Estimated delivery: 30.09 - 02.10
Today: 09:00 - 17:00
Multitronic Jyväskylä: 0 pcs
Estimated delivery: 30.09 - 02.10
Estimated delivery: 30.09 - 02.10
Today: 10:00 - 17:00
Multitronic Lappeenranta: 0 pcs
Estimated delivery: 30.09 - 02.10
Estimated delivery: 30.09 - 02.10
Today: 10:00 - 18:00
Multitronic Mariehamn: 0 pcs
Estimated delivery: 30.09 - 02.10
Estimated delivery: 30.09 - 02.10
Today: 10:00 - 18:00
Fetch from the shop
Estimated delivery time: 30.09 - 02.10
Estimated delivery time: 30.09 - 02.10
Matkahuolto: Parcel lockers and service points
Estimated delivery time: 01.10 - 02.10
Estimated delivery time: 01.10 - 02.10
Posti: Parcel lockers and service points
Estimated delivery time: 30.09 - 01.10
Estimated delivery time: 30.09 - 01.10
Posti: Postal package
Estimated delivery time: 01.10 - 02.10
Estimated delivery time: 01.10 - 02.10
Posti: Doorstep delivery
Estimated delivery time: 01.10
Estimated delivery time: 01.10
Posti: Home delivery
Estimated delivery time: 01.10
Estimated delivery time: 01.10
The above technical details are for reference only and may change without notice. We reserve the right to correct printing errors and use illustrations for guidance. Some text may be auto-generated or machine-translated, which could lead to inaccuracies.